{"id":289862,"date":"2024-05-28T16:14:51","date_gmt":"2024-05-28T14:14:51","guid":{"rendered":"https:\/\/www.larix-engineering.at\/project\/weltmuseum-vienna\/"},"modified":"2025-08-21T14:48:37","modified_gmt":"2025-08-21T12:48:37","slug":"weltmuseum-vienna","status":"publish","type":"project","link":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/","title":{"rendered":"Weltmuseum Vienna"},"content":{"rendered":"\n<p>The Neue Burg within the Hofburg complex was originally fitted with a heating and ventilation system designed by Carl B\u00f6hm, which was considered cutting-edge for its time. The air heating system, with an external air supply provided warm temperatures in winter, while one of the basement levels was explicitly built with large openings and functioned as an \u2018air well\u2019 to allow fresh air to flow into the living spaces. The historic supply air system was reactivated when the the Corps de Logis wing of the Vienna Hofburg became home to the new Weltmuseum Wien.  <\/p>\n\n<p><br\/>We used a multi-zone <strong>building energy modelling<\/strong> to explore the possibilities of using the existing thermal masses and planned the entire ventilation system for the exhibition rooms to be supplied by the historic \u201cair well\u201d. We also supervised the <strong>building systems regulation<\/strong> and <strong>monitoring<\/strong> during the first two years of operation. <br\/><br\/><\/p>\n\n<p>By utilizing adjustable air volume control in combination with the building\u2019s thermal mass, a reliable and nearly climate-neutral cooling of the museum spaces is achieved, significantly reducing technical complexity and eliminating the need for mechanical refrigeration.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Neue Burg within the Hofburg complex was originally fitted with a heating and ventilation system designed by Carl B\u00f6hm, which was considered cutting-edge for its time. The air heating system, with an external air supply provided warm temperatures in winter, while one of the basement levels was explicitly built with large openings and functioned [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":288752,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"project_category":[188],"project_tag":[286],"leistung":[250],"class_list":["post-289862","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-other-es","project_tag-existing-context","leistung-simulacion"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Weltmuseum Vienna - Larix Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Weltmuseum Vienna - Larix Engineering\" \/>\n<meta property=\"og:description\" content=\"The Neue Burg within the Hofburg complex was originally fitted with a heating and ventilation system designed by Carl B\u00f6hm, which was considered cutting-edge for its time. The air heating system, with an external air supply provided warm temperatures in winter, while one of the basement levels was explicitly built with large openings and functioned [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/\" \/>\n<meta property=\"og:site_name\" content=\"Larix Engineering\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-21T12:48:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.larix-engineering.at\/wp-content\/uploads\/2024\/05\/WELT_small.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"856\" \/>\n\t<meta property=\"og:image:height\" content=\"473\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/es\\\/project\\\/weltmuseum-vienna\\\/\",\"url\":\"https:\\\/\\\/www.larix-engineering.at\\\/es\\\/project\\\/weltmuseum-vienna\\\/\",\"name\":\"Weltmuseum Vienna - Larix Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/es\\\/project\\\/weltmuseum-vienna\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/es\\\/project\\\/weltmuseum-vienna\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.larix-engineering.at\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/WELT_small.jpg\",\"datePublished\":\"2024-05-28T14:14:51+00:00\",\"dateModified\":\"2025-08-21T12:48:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/es\\\/project\\\/weltmuseum-vienna\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.larix-engineering.at\\\/es\\\/project\\\/weltmuseum-vienna\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/es\\\/project\\\/weltmuseum-vienna\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.larix-engineering.at\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/WELT_small.jpg\",\"contentUrl\":\"https:\\\/\\\/www.larix-engineering.at\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/WELT_small.jpg\",\"width\":856,\"height\":473},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/es\\\/project\\\/weltmuseum-vienna\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.larix-engineering.at\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/www.larix-engineering.at\\\/project\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Weltmuseum Vienna\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/#website\",\"url\":\"https:\\\/\\\/www.larix-engineering.at\\\/\",\"name\":\"Larix Engineering\",\"description\":\"sustainable building solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.larix-engineering.at\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/#organization\",\"name\":\"Larix Engineering\",\"url\":\"https:\\\/\\\/www.larix-engineering.at\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.larix-engineering.at\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/cropped-favicon.png\",\"contentUrl\":\"https:\\\/\\\/www.larix-engineering.at\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/cropped-favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Larix Engineering\"},\"image\":{\"@id\":\"https:\\\/\\\/www.larix-engineering.at\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Weltmuseum Vienna - Larix Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/","og_locale":"es_ES","og_type":"article","og_title":"Weltmuseum Vienna - Larix Engineering","og_description":"The Neue Burg within the Hofburg complex was originally fitted with a heating and ventilation system designed by Carl B\u00f6hm, which was considered cutting-edge for its time. The air heating system, with an external air supply provided warm temperatures in winter, while one of the basement levels was explicitly built with large openings and functioned [&hellip;]","og_url":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/","og_site_name":"Larix Engineering","article_modified_time":"2025-08-21T12:48:37+00:00","og_image":[{"width":856,"height":473,"url":"https:\/\/www.larix-engineering.at\/wp-content\/uploads\/2024\/05\/WELT_small.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Tiempo de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/","url":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/","name":"Weltmuseum Vienna - Larix Engineering","isPartOf":{"@id":"https:\/\/www.larix-engineering.at\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/#primaryimage"},"image":{"@id":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/#primaryimage"},"thumbnailUrl":"https:\/\/www.larix-engineering.at\/wp-content\/uploads\/2024\/05\/WELT_small.jpg","datePublished":"2024-05-28T14:14:51+00:00","dateModified":"2025-08-21T12:48:37+00:00","breadcrumb":{"@id":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/#primaryimage","url":"https:\/\/www.larix-engineering.at\/wp-content\/uploads\/2024\/05\/WELT_small.jpg","contentUrl":"https:\/\/www.larix-engineering.at\/wp-content\/uploads\/2024\/05\/WELT_small.jpg","width":856,"height":473},{"@type":"BreadcrumbList","@id":"https:\/\/www.larix-engineering.at\/es\/project\/weltmuseum-vienna\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.larix-engineering.at\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.larix-engineering.at\/project\/"},{"@type":"ListItem","position":3,"name":"Weltmuseum Vienna"}]},{"@type":"WebSite","@id":"https:\/\/www.larix-engineering.at\/#website","url":"https:\/\/www.larix-engineering.at\/","name":"Larix Engineering","description":"sustainable building solutions","publisher":{"@id":"https:\/\/www.larix-engineering.at\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.larix-engineering.at\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.larix-engineering.at\/#organization","name":"Larix Engineering","url":"https:\/\/www.larix-engineering.at\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.larix-engineering.at\/#\/schema\/logo\/image\/","url":"https:\/\/www.larix-engineering.at\/wp-content\/uploads\/2024\/05\/cropped-favicon.png","contentUrl":"https:\/\/www.larix-engineering.at\/wp-content\/uploads\/2024\/05\/cropped-favicon.png","width":512,"height":512,"caption":"Larix Engineering"},"image":{"@id":"https:\/\/www.larix-engineering.at\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/project\/289862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/comments?post=289862"}],"version-history":[{"count":1,"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/project\/289862\/revisions"}],"predecessor-version":[{"id":289863,"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/project\/289862\/revisions\/289863"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/media\/288752"}],"wp:attachment":[{"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/media?parent=289862"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/project_category?post=289862"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/project_tag?post=289862"},{"taxonomy":"leistung","embeddable":true,"href":"https:\/\/www.larix-engineering.at\/es\/wp-json\/wp\/v2\/leistung?post=289862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}